brian m Vor 16 Jahren Hi Michael,a few questions.a) Is version 5 no longer going to separate the portlets from the core? This was a big point often mentioned on the forums and I know that the plan was to separate the core from the portlets. Is this gone now as a plan?b) Do you have any indicative timelines for version 5 and version 5.1?c) Can you expand on the idea for the social networking apps.d) Can you expand on your plan for security...is it something like using acegi?thanks and regards,Brian Melden Sie sich an, um auf diesen Beitrag zu antworten. Antworten als... Abbrechen Michael Young brian m Vor 16 Jahren a) we still do plan to separate the portlet, but not until 5.1 or 5.2b) 5.0 currently slated for feb, 5.1 for aprilc) we're looking at ways to allow liferay consume and publish to facebook, igoogle, and support for open sociald) we're going to go through the points listed on the owasp.org top 10 and make sure we have them all down. Melden Sie sich an, um auf diesen Beitrag zu antworten. Antworten als... Abbrechen
Michael Young brian m Vor 16 Jahren a) we still do plan to separate the portlet, but not until 5.1 or 5.2b) 5.0 currently slated for feb, 5.1 for aprilc) we're looking at ways to allow liferay consume and publish to facebook, igoogle, and support for open sociald) we're going to go through the points listed on the owasp.org top 10 and make sure we have them all down. Melden Sie sich an, um auf diesen Beitrag zu antworten. Antworten als... Abbrechen
Tobias Hofmann Vor 16 Jahren Hi Michael,is there a chance that the configuration of Liferay will be more easy? I'm hoping for a database store of the configuration. This would allow for real-time changes from inside the portal (like changing the e-mail server, allowd files for the document library, upload size, etc).As a nice side effect, using a DB for storing the configuration would also allow to set up 1 central Conf-DB for all Liferay systems in a landscape (dev, test, qa, pre-prod, prod, maint) and to transport a configuration change throught the landscapes. This would also allow for a more easy adoption of ITIL and COBIT. Thanks and best regards,Tobias Melden Sie sich an, um auf diesen Beitrag zu antworten. Antworten als... Abbrechen nidhi singh Tobias Hofmann Vor 15 Jahren Hi Michael,Scheduler is not working in 5.1.2 and 5.0.2i am using staging and publish a page from stage to live and do some changement in scheduler, page is not published if i do some changement in scheduler.please reply meis it bug?ThanksNidhi Singh Melden Sie sich an, um auf diesen Beitrag zu antworten. Antworten als... Abbrechen
nidhi singh Tobias Hofmann Vor 15 Jahren Hi Michael,Scheduler is not working in 5.1.2 and 5.0.2i am using staging and publish a page from stage to live and do some changement in scheduler, page is not published if i do some changement in scheduler.please reply meis it bug?ThanksNidhi Singh Melden Sie sich an, um auf diesen Beitrag zu antworten. Antworten als... Abbrechen